Background

Eggborough Power Station had three £multi million turbines that were to be stored outside for a period of at least two to three years. These were currently being stored with only tarpaulin covers and were starting to rust.

1) The Task

Lake Chemicals and HITEK-nology Solutions Ltd was approached to provide a solution that would allow the turbines to be stored outside, whilst at the same time being protected from corrosion.

Eggborough Power Station Turbines 1

2) Product Used

  • VpCI 126 HP UV Shrink Film
  • VpCI 132 Foam
Eggborough Power Station Turbines 3 1

3) The Solution

VpCI 132 foam pads were placed around the turbines.

VpCI 126 HP UV Shrink Film was then placed around the turbines and shrunk into place using a propane powered gas gun.

This treatment has resulted in the low cost storage of these high value assets for a period of up to three years.